Frequently Asked Questions

About Us Our Privileges Career Our Way of Working Certificates Frequently Asked Questions

Yes; We serve every region in the country and abroad.

The selected project is examined in detail, the necessary analyzes are made and the square meter cost is determined as a result of this data. Project details such as the types of trees to be used in construction, workmanship details, the area of ​​​​the project, how many floors it will have, and the number of rooms determine the prices.

The same price is applied to all domestic projects.

In standard packages, the main materials of the building (walls, connection elements, ceiling paneling, floor wood covering), solid exterior and interior doors, wooden windows, transoms, double-glazed windows, transparent or covering paints in desired colors, shingle roofing material, assembly works and electrical water installations are included in the price.

You can request detailed technical specifications from our e-mail address.

A occupancy report is required. For the occupancy report, you need to apply to the Zoning Directorate of the Municipality to which the area where the building will be built is affiliated.

- Petition for request for license
- Copy of title deed
- Application sketch
- Diameter
- Zoning status
- Notary public technical responsibility commitment that the projects will be implemented on site from the beginning to the end in accordance with the Earthquake Regulation conditions (from an architect or civil engineer)
- Architectural project
- Static project

- Electrical project

- Plumbing project

Obtaining the construction occupancy report.

Excavation works of the area where the structure will be built and construction of the ground water base concrete. Water base project; The land and ground are examined by expert personnel and the appropriate construction method is determined and prepared as a town and given to the homeowner.

Provision of kitchen and bathroom cabinets, furnishing works and materials to be used in wet areas

Construction of the installations such as electricity, waste water and indoor water within the scope of the sanitary installation project known as external connections of the structure.

Electrical project: Provision of electrical materials. The required materials are determined by our technical team and given to you as a list. The places where the electrical and water installations will pass are determined during the project phase and the installation is placed in these parts and the cables are not visible.

Environmental arrangement, all landscaping and decoration operations are the responsibility of the homeowner. We provide interior and exterior decoration upon request with an additional fee.

Provision of electricity required for the assembly of the wooden structure.

Cost programming is done by analyzing data such as the type of wood to be used in the structure, project square meters, techniques to be used, difficulties in the production and assembly phase and durability details, wall appearances, roof type, insulation and thermal treatments for dividing the insulation. In order not to experience any problems in the future, we recommend that you stay away from companies that give square meter prices before the project details are determined and the necessary static analyses are performed. As Baneva, we do not prefer to purchase with a m²-based pricing policy.

Wood, which has a unique thermal insulation, is suitable for use in summer and winter. Since wood has an insulating structure, it keeps the heat inside the structure and offers a comfortable living opportunity with its high insulation in regions with both cold and hot climates. Unlike reinforced concrete structures, you spend less energy and get more warmth and coolness.

Since the wooden structure traps the heat in regions with hot climates, it maintains the temperature level needed for cooling for a longer time. In countries with cold climates such as Finland, Canada and Sweden, 95% of the structures are wooden construction structures. In other words, the idea that it will be cold in winter is completely wrong.

These structures provide more heat insulation compared to other structures, thus reducing heating costs. Therefore, you should choose a heating system that will provide you with more efficient heat energy.

You can easily use any type of heating system you want, such as a combi boiler, stove, fireplace, air conditioner. If the desired heating type is selected during the project phase, the installation channels are made accordingly, and although we generally recommend using air conditioners, we provide the necessary technical support if the customer prefers to use a different heat power.

All our wooden construction systems have high insulation values. In order to reach high insulation values, we meticulously process the corners and overlapping tree teeth with special methods. We use high density styrofoam for insulation in sandwich panel systems where only thin wood material is used.

In outdoor projects, floors that will be exposed to excessive wear are processed additionally. In social areas; especially floors (decks) are exposed to very bad conditions, so extra maintenance work needs to be done in such areas.

In very cold climates, it is sufficient to use 90 mm wall thickness instead of 42 mm and 100 mm roof insulation instead of 50 mm.

Depending on the size and detail of the project, the assembly change varies.

average assembly conditions

15-30 days for houses between 20-100 m²

30-60 days for houses between 100-300 m²

60-90 days for houses between 300-500 m²

90 days for houses over 500 m² depending on the project and planning...

It is not very healthy to give a definite date before the project details are finalized. In addition, sometimes we may encounter technical problems that are not caused by us and this delivery period is extended. For this reason, we regularly organize both parts of our delivery contract.

We look at high-volume orders as projects and price them according to the content of the project. In this case, the cost gains from mass production are reflected as a discount depending on the quantity and the status of the order.

With our systems, we can easily go up to 2 floors, more floors can be reached, but since the wood thickness and construction system will change, the square meter unit cost increases.

Yes; we have many projects for businesses such as wooden cafes, bungalow hotels, schools, restaurants, wooden offices, hobby workshops, etc. You can examine our cafe and social area projects and look at our references.

We can implement all plans as long as the plan you request does not include openings longer than 12 meters.

Compared to other structures, wooden structures are more durable and have a much longer lifespan. Wood is the oldest and most commonly used building material. There are wooden structures in Norway, Finland and Germany that have survived for 800 years and defy history.

In addition, we extend the service life thanks to the impregnation process we apply in our facility and the special wood paints we use.

Your home will defy time with maintenance done every 5 years.

As Baneva; In all our natural living space projects, the highest quality, environmentally friendly materials and water-based varnish and paint options specially produced for wooden houses that preserve the natural appearance.

Depending on the climate conditions of the region where your house is located and the purpose of air conditioning use, you need to do maintenance every 5-8 years. For standard maintenance, painting the exterior is sufficient. You can do this process as desired. If there are cracks, mold or damage in the wood, these parts should be stored before the painting intervals.

Maintenance-repair costs vary depending on the square meter of your house and the deformation in its structure. You can contact our technical team for maintenance and repair prices.

Wood is a breathing and living material. This feature of wood allows you to live in an environment with plenty of oxygen.

It provides you with healthier air by filtering the humidity that harms human health and the environment.

Wooden material; cleans the environment by ionizing the gases and bacteria that harm human health.

Wood is a perfect insulator that shows high resistance to electric current, there is no electromagnetic field in wooden structures like in reinforced concrete buildings.

Yes; they are the most earthquake-resistant structures.

The biggest cause of death in earthquakes in the past is the weight of concrete. Wooden beams and beams have the ability to carry more loads than concrete and steel. Reinforced concrete structures are heavier than these structures and these weights cause more deaths. For example, while a 100 m² reinforced concrete house weighs 70 tons, houses built with a frame system weigh between 7-9 tons.

In addition, wood is flexible and bends and twists by absorbing earthquake waves and is less fragile. Since columns and beams in reinforced concrete buildings do not flex, they cannot resist the collapse of the building.

For this reason, wooden frame system structures are predominantly used in regions with high earthquake risk.

One of the misconceptions about wooden structures is that they are not resistant to fire. However, contrary to popular belief, wooden structures are more resistant than other types of structures. Research and statistics on fire also support this.

Yes, it is possible to dismantle the structure and install it in another area. However, the structure will be damaged, even if only slightly. Transporting it, re-installing it and repairing the damage is difficult and costly.

You can make revisions on our existing projects, adapt any wooden house, log house, bungalow project to your own, or request a completely special project by telling us about your dream house.

White Pine; It is a log type that is quite resistant to shrinkage and bending, has a high temperature value and is cheap, and is the most preferred building material for tree house design due to these products.

Red Cedar; Red cedar, which is quite resistant to bad weather conditions and humid climates, has a low moisture content due to its soft texture. It is more expensive than other logs.

Yellow Pine; It is quite low in rates. However, its structure is quite hard and it contains more resin than white pine. It is generally used in doors and furniture in log houses.

Oak Tree; It is quite difficult to work on this tree, which is quite durable and ages very late, and requires very good craftsmanship. Oak is the most supportive of log houses.

Spruce Tree; There is no limit to the amount of resin of spruce, which has a light, soft texture. For this reason, it is mostly used in dry climate regions.

We use kiln-dried laminated timber in our structures. The essence of the wood is what causes all these problems and the rotting of the wood, and the only way to remove this essence is to heat treat it. Such problems do not occur in kiln-dried wood.

40% of the total amount upon confirmation of your order

30% of the remaining payment is taken upon shipment, and the remaining 30% upon delivery.

For small structures, the full payment is taken when the order is confirmed.

The payment plan varies from project to project.